Installed (3) DAIKIN Roof Top Units, (22) Air Handling Units, (8) Condensing Units, (15) Electric Base Board Heaters, (6) GREENHECK Fans, and accompanying equipment. Oversaw implementation of Building Management System to include BACNET. Fabricated and installed all duct. Field verified all louvre and grille measurements and installed along with motorized dampers, including Fire Smoke Dampers. Installed condensate pumps and piping. Scheduled Air balancing report. Lift Mechanical units up to roof and installed necessary isolators.